• I have a permit to work and a powered system isolation certificate.
  • I have identified all energy and fluid sources.
  • I respect the isolation process and associated controls.
  • I confirm that energy and fluid sources have been isolated, locked and tagged.
  • I ensure that there is no energy and fluid supply by checking for zero energy state.
  • I ensure that there is no residual or accumulated energy and fluid.
  • I ensure that the work is completed and check the removal of isolation before starting up.